PRV6 / NL1 — 7th (residential)
NRW zone study refresh · Window: Oct 2025 – Jun 2026 (9 mo, Jun preliminary) · Supply: SCADA PRV06-01 − PRV06-02 · AWC NRW & Energy Efficiency Dept.
← All DMAs NL6 → PRV6 combined → CNS 20-07-2026
Monthly supply vs billed — Oct 2025 – Jun 2026
⚠ Jun-26 preliminary — reads still coming in
NL1 supply = PRV06-01 − PRV06-02 (SCADA). Jun-26 bill count ~5–6% below trailing average; NRW% will settle as billing completes. Mar-26 supply uses the revised SCADA re-read (+0.26% / +0.40%).
Problem worklist — 317 accounts (9-mo window)
NL1: 317 of 950 active (33.4%)
Big-consumer note: top-20 = only 22.1% of zone volume — residential profile, no meter concentration. ⚠ The zone's #1/#2 consumers (contracts 62541, 74902) have no GPS in CNS.
Zone map — DMA & customer locations
Use the layer control (top-right) to show NL1 only · marker size = avg m³/mo · gold ring = big consumer
Data quality, roster & verification — NL1
Data as of CNS export 20-07-2026 · SCADA PRV06-01/02 read 21-07-2026 · Prepared by NRW Section · Aqaba Water Company · Made by Ehab Basuoni